Siemens 6GK1 901-1GB01 System Manual page 41

Passive network components. industrial ethernet / profinet
Table of Contents

Advertisement

To assemble 8-wire FC cables, the following inserts are available:
● Insert 2 FE
● Insert 1GE
Procedure
1. Remove the locking screw of the
insert. (1.)
Pull the insert forward as far as the
limit stop. (2.)
4. Use the green knife cassette (5.1
mm) in the stripping tool.
If necessary adjust the cutting depth
of the knife cassette with the middle
socket-head screw.
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
Note
Instructions for assembly
 The IE hybrid cable 2x2 + 4x0.34 6XV1870-2J and 4-wire FC cables (Cat 5) are not
suitable for insert 2 FE and insert 1 GE
 The insulation-piercing contacts of the IE FC RJ-45 plug 4x2 can be released and
recontacted with the same cable cross section up to 10 times.
 Once the ends of cables have made contact, do not make contact with them again but
cut them off.
2. Now release the two cover screws
that are now accessible.
5. Take the stripping tool in your right
hand.
6. Measure the cable length against
the measuring template. Use your
left index finger as the limit stop.
(9.)
Instructions for fitting connectors, attachments and devices
3. Lift up the cover of the IE FC RJ-45
7. Place the cable in the stripping tool.
2.3 Electrical networks
modular outlet. (4.)
Lift up the 4 terminals of the
terminal block. (5.)
Your left index finger is the limit
stop.
Tighten the stripping tool until it
locks into place (audible click).
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6gk1 901-1ga006gk1 901-1gb00

Table of Contents