15. Close the cover.
16. Turn the locking mechanism with
your hand as far as possible in the
direction of the arrow.
2.3.2

Fitting IE FC cable 2 x 2 with an IE FC RJ-45 plug PRO

Introduction
The individual steps required to assemble a 4-wire IE FC cable and an IE FC RJ-45 plug Pro
are explained below.
Refer to the information in this section "Industrial Ethernet FastConnect stripping tool
(Page 8)" and the installation instructions for the plug.
Note
Instructions for assembly
 The insulation-piercing contacts of the IE FC RJ-45 plug Pro can be released and
 Once the ends of cables have made contact, do not make contact with them again but cut
 Do not pull on the plug when releasing it.
 To assemble a cable with crossed over wires, connect the color-coded wires at one end
Passive network components
System Manual, 02/2013, C79000-G8976-C282-01
17. Insert a 2.5 mm screwdriver into the
hole in the locking mechanism and
continue turning it as far as the limit
stop.
recontacted up to 10 times.
them off.
of the cable in the connector as shown below:
– connect white with yellow
– connect blue with orange
Instructions for fitting connectors, attachments and devices
18. The connector is correctly locked
2.3 Electrical networks
when the opening of the locking
mechanism is at the side and the
side edges are flush with the
connector.
13