Transceiver Unit - Furuno CH-500 Installation Manual

Dual-frequencysearchlight sonar
Hide thumbs Also See for CH-500:
Table of Contents

Advertisement

2. Secure the control fixing fixture to the control unit, using two hex. head slot bolts
(M4 12).
Control fixing
fixture
3. Connect the cables to the unit, referring section 2.3.
4. Set the unit to the mounting hole, then secure the unit with four self-tapping
screws ( 5 20).
Self-tapping screw
(Ø5×20, 4 pcs)
1.5

Transceiver Unit

Mount the transceiver unit on a bulkhead.
Mounting consideration
Select a mounting location, keeping in mind the following points:
• Keep the display unit out of direct sunlight.
• Locate the unit away from places subject to water splash and rain.
• Locate the unit away from exhaust pipes and ventilators.
• The mounting location should be well ventilated.
• Select a location where shock and vibration are minimal.
• Referring to the outline drawings at the back of this manual, allow sufficient space
for maintenance and service.
• Select a mounting location considering the length of the cables to be connected to
the unit.
Hex. head slot bolt
(M4×12, 2 pcs)
1. MOUNTING
1-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch-600

Table of Contents