5.2 Minimum clearances in the control cabinet

5.2
Minimum clearances in the control cabinet
You must ensure the following clearances when installing the rail:
Table 5-1
The mounting depth of the ET 200SP HA results from the interlocking components (standard rail, carrier
module, terminal module and I/O module). The mounting depth is 162 mm. There should be at least 10
mm of space in front of the front panel of the modules.
Ensure the heat dissipation.
Observe the minimum clearances of the IO device in the control panel or to surrounding components.
Leave sufficient space for the wiring and the communication cable connection.
See also
Mechanical and climatic environmental conditions (Page 143)
60
Minimum clearances for the installation of the IO device in the control cabinet
Left
10 mm
Upper
40 mm
Lower
20 mm
ET 200SP HA Distributed I/O system
System Manual, 08/2019, A5E39261167-AD
Right
10 mm