Installing Sneak Fuse Panels - AT&T System 75 Wiring Diagram

Hide thumbs Also See for System 75:
Table of Contents

Advertisement

Equipment Room Hardware And Cabling Installation
Table 3-H. Auxiliary Lead Appearances at 66-Type Cross-Connect
Field (Contd)
System
66-Type
Conn
75 Auxiliary
Block
Connector
Term
Outputs
35
Not Connected
36
GND
37
38
48
GND
39
40
-48
GND
41
42
-48
43
44
45
Not Connected
46
47
48
49
INADS
50

Installing Sneak Fuse Panels

The sneak fuse panel (Figure 2-18) must be installed as near as
possible to the network interface. To install the sneak fuse panel,
proceed as follows:
1.
Hold the panel against the mounting surface and mark the upper
right and lower left mounting screw locations.
2.
Drill pilot holes at the marked locations, and partially install the 3/4
inch No. 12 screws.
3.
Slide the sneak fuse panel onto the mounting screws and tighten
the screws.
4.
Repeat the procedure for each sneak fuse panel.
75 XE Auxiliary
Connector
ACC Power
Not Connected
Ext Alarm A
Ext Alarm B
Not Connected
Z1A
System
Emerg
Xfr Unit
Outputs
Outputs
TK
LC
ST
TC
TK
LC
ST
PWR
INADS
574-5
Power
Xfr Unit
Outputs
TK
LC
ST
COM1
N01
NC2
NC1
COM2
N02
COM3
NC3
GRD
-48V
3-63

Advertisement

Table of Contents
loading

This manual is also suitable for:

System 75 xe

Table of Contents