AT&T System 75 Wiring Diagram page 207

Hide thumbs Also See for System 75:
Table of Contents

Advertisement

CHAPTER 4. STATION WIRING
Installing 4-Pair Station Cables
The 4-pair station cables can either be plugged into adapters or
field-terminated at the cross-connect field and then run to the information
outlets.
Installing Information Outlets
Install the information outlets (Figure 4-7) at the designated
telephone/voice terminal locations. See Table 3-I for connection
information.
4-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

System 75 xe

Table of Contents