The internal air line normally used to supply the solenoid manifold is instead used to provide
positive airflow pressure to the bellows/outer link. You can use one of the passive 6 mm user
air lines shown in Figure 9-12. and Figure 9-13.
9.6 Maintenance
IP65 Bellows Replacement
Check the bellows, p/n 04625-000, periodically for cracks, wear, or damage. Replace bellows, if
necessary, using the procedure below.
1. Remove the lower bellows clamp by removing two M3 screws and pulling the clamp
apart. See Figure 9-14.
2. Remove the tool flange. For the tool flange removal procedure, refer to Removing and
Installing the Tool Flange on page 123.
3. Remove the upper bellows clamp by removing two M3 screws and pulling the clamp
apart.
4. Slide the old bellows down off of the quill.
5. Install a new bellows by sliding it up onto the quill.
6. Re-install the upper bellows clamp. You must align mating surface of the clamp half-
rings with the bellows seam—see Figure 9-15. Tighten the screw to secure the bellows.
7. Re-install the tool flange.
8. Place new gaskets in the lower bellows clamp—extra gaskets are shipped in the access-
ory kit. Then install the clamp over the bottom of the bellows, on the bearing ring just
above the tool flange. Align the mating surfaces of the clamp half-rings with the bellows
seam—see Figure 9-15. Tighten the screw to secure the clamp.
Figure 9-14. Bellows Replacement
14402-000 Rev. F
NOTE: Align the bellows clamps with the
bellows seam, on both upper and lower
1
clamps.
4
2
3
Figure 9-15. Bellows Clamp Alignment (Cross-
eCobra User's Guide
Chapter 9: IP65 Option
5
4
2
Section View)
185