Chapter 3 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-F Series User Manual

Programmable controller
Hide thumbs Also See for MELSEC iQ-F Series:
Table of Contents

Advertisement

3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
EtherNet/IP communication
1.
Checking the specifications of the FX5-ENET/IP
Check the specifications of the FX5-ENET/IP. (Page 18 SPECIFICATIONS)
2.
Installation of the FX5-ENET/IP
Connect the FX5-ENET/IP to the CPU module. For details, refer to the following.
MELSEC iQ-F FX5U User's Manual (Hardware)
MELSEC iQ-F FX5UC User's Manual (Hardware)
3.
Configuring a network
Configure a network and set parameters which are required for start-up.
• Wiring (Page 45 WIRING)
• Parameter setting (Page 49 PARAMETER SETTINGS)
4.
Network diagnostics
Check the connection status of the connected EtherNet/IP device using EtherNet/IP Configuration Tool for FX5-ENET/IP.
(Page 116 Checking the Network Status)
5.
Programming
Create a program. (Page 103 PROGRAMMING)
6.
Check the communication status
Check the communication status of FX5-ENET/IP. (Page 109 Checking the Module Status)
Precautions
When referring to the above manuals, replace the module name as shown below.
• FX5-ENET → FX5-ENET/IP
General-purpose Ethernet communication
1.
Checking the specifications of the FX5-ENET/IP
Check the specifications of the FX5-ENET/IP. (Page 18 SPECIFICATIONS)
2.
Installation of the FX5-ENET/IP
Connect the FX5-ENET/IP to the CPU module. For details, refer to the following.
MELSEC iQ-F FX5U User's Manual (Hardware)
MELSEC iQ-F FX5UC User's Manual (Hardware)
3.
Configuring a network
Configure a network and set parameters which are required for start-up.
• Wiring (Page 45 WIRING)
• Parameter setting (Page 49 PARAMETER SETTINGS)
In the following steps, see the following manual for each function.
MELSEC iQ-F FX5 User's Manual (Ethernet Communication)
Precautions
When referring to the above manuals, replace the module name as shown below.
• FX5-ENET → FX5-ENET/IP
3 PROCEDURES BEFORE OPERATION
3
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fx5-enet/ip

Table of Contents