Siemens Simatic PCS 7 Function Manual page 249

High availability process control systems
Hide thumbs Also See for Simatic PCS 7:
Table of Contents

Advertisement

How to configure the redundant PROFIBUS PA, 128
How to download a SIMATIC BATCH project to the
target system, 176
How to set the redundancy of the BATCH
servers, 175
How to set the redundancy of the Route Control
servers, 186
HW Config
Starting, 143
I
I/O, 35, 38, 40, 42
Central, 35
Distributed, 35
FF link, 87
PA Link, 81
Redundant, 38, 40
Redundant actuators and sensors, 48
Redundant I/O modules, 46
Redundant interfacing, 45
Single-channel switched distributed I/O, 42
Y Link, 80
IM 153-2, 133
Increasing availability, 50
Automation system, 50
Input/output module, 136, 140
Configuring, 136, 140
Operating principle, 136, 140
Setup, 136, 140
Inserting, 108
H station, 108
Inserting a SIMATIC H station, 108
Inserting sync modules, 52
Interfacing, 45
M
Master CPU, 202
Reintegration, 202
Response to failure, 202
Module-based, 113
Modules, 196
Adding, 196
Removing, 196
Multiproject engineering, 104
N
Network components, 56
High Availability Process Control Systems (V9.0)
Function Manual, 05/2017, A5E39221836-AA
O
Open
Existing STEP 7 project, 143
Operating principle, 53, 94, 97, 136, 140
OS server, 94
Permanent operability, 97
Redundant I/O modules, 136, 140
S7-400H, 53
Optical PROFIBUS, 76
Optical ring, 54
Optical/electrical ring, 54
Option
Configuration via PDM, 131
OS client, 97, 163
Additional, 97
Configuring, 163
Permanent operability, 97
OS clients, 213
Switchover characteristics, 213
OS server
Availability, 94
Configuring, 152
Creating, 152
Failure, switchover and restart, 205
Operating principle, 94
Setup, 94
Time synchronization, 105
OS terminal, 97
OSM, 54
Overview of configuration steps, 133, 152, 170, 178
Overview of features, 24
PCS 7, 24
P
PA Link, 81
Passivation reaction, 113
PC station, 104
PCS 7 overview of features, 24
Features for commissioning, 27
Features for servicing, 29
Features for the configuration phase, 26
Features for the operation phase, 27
Permanent operability, 97
Operating principle, 97
Plant bus
Configuring, 117
Connecting, 61
Plant bus";"Redundant high availability, 74
Index
249

Advertisement

Table of Contents
loading

Table of Contents