Siemens Simatic PCS 7 Function Manual page 177

High availability process control systems
Hide thumbs Also See for Simatic PCS 7:
Table of Contents

Advertisement

Requirements
● The PCS 7 project is open in SIMATIC Manager in the component view.
● The SIMATIC BATCH configuration is completed.
● The batch plant is compiled.
Download via SIMATIC BATCH
1. Select the menu command Options > SIMATIC BATCH.
The "Plant Data" dialog box opens.
2. Select the plant object in the tree view.
3. Click "Download".
All PC stations for BATCH servers (single, redundant), DB servers and BATCH clients are
displayed with information about their download status in the "Downloading <plant>" dialog
box.
4. Click "Start".
The plant object is downloaded.
Additional information
● Manual
High Availability Process Control Systems (V9.0)
Function Manual, 05/2017, A5E39221836-AA
Process Control System PCS 7; SIMATIC BATCH
Advantages of high availability components
5.6 SIMATIC BATCH stations
177