How To Determine The S7 Programs You Want To Assign To A Given Os - Siemens Simatic PCS 7 Function Manual

High availability process control systems
Hide thumbs Also See for Simatic PCS 7:
Table of Contents

Advertisement

Advantages of high availability components
5.5 Operator stations
3. Select the shortcut menu command Redundancy Settings....
The "Redundancy Settings" dialog box opens.
4. Select the connection path through which the OS server pair is connected in the drop-down
list.
– For connection via RJ45 cable:
– For a serial connection:
5. Click "OK".
5.5.7

How to determine the S7 programs you want to assign to a given OS

Introduction
The AS-OS assignment of a hierarchy folder in the plant view of SIMATIC Manager results in
the following in the component view:
● All CFCs and SFCs inserted in the plant view are stored in the chart folder of the assigned
AS.
● All pictures and reports inserted in the plant view are stored in the folder of the assigned
OS.
Requirements
● The PCS 7 project is open in SIMATIC Manager.
● The plant view is activated.
Procedure
1. Select the hierarchy folder for which you want to make the AS-OS assignment in the plant
view.
2. Select the menu command Edit > Object Properties and change to the "AS-OS Assignment"
tab.
3. From the "Assigned AS" list, select the S7 program that you want to assign to the selected
hierarchy folder.
162
In the "Network adapter" drop-down list, select the network adapter to which you want
to attach the network cable for the redundant connection between the two PC stations
of a server pair.
In the "Serial port" dropdown list, select the port to which you want to attach the null-
modem cable for the redundant connection between the two PC stations of a server
pair: "COM1" or "COM2"
Note
One connection path is permitted between the two PC stations in a redundantly
configured server.
High Availability Process Control Systems (V9.0)
Function Manual, 05/2017, A5E39221836-AA

Advertisement

Table of Contents
loading

Table of Contents