Chapter 2: Installation Procedures; Introduction; Important; Sequence Of Operations - Raymarine ST290 Owner's Handbook Manual

Instrument system
Hide thumbs Also See for ST290:
Table of Contents

Advertisement

81183_2 S6.book Page 1 Wednesday, May 7, 2003 11:27 AM

Chapter 2: Installation Procedures

2.1 Introduction

Important

WARNING:
Make sure you have switched off the power supply before you start
installing this product.
CAUTION:
Where it is necessary to drill or cut holes (e.g. for cable routing and
instrument mounting):
Before commencing any installation procedure, ensure that you have
read and understood Section 6,Chapter 1, and that you are able to meet
the requirements described there. Provided you adhere to those
conditions, you can position the ST290 system components as required.

Sequence of operations

Typical installation procedures are described in the following sequence:
If necessary, adapt this sequence to best suit your situation.
ST290 Instrument System Owner's Handbook
Ensure that these will not cause a hazard by weakening critical
parts of the vessel's structure. If in doubt, seek advice from a
reputable boat builder.
Ensure that you do not damage items behind the surfaces you cut.
Running SeaTalk & SeaTALK
Fitting Data Processing Unit.
Fitting Speed, Depth and Wind transducers.
Fitting transducer Pods.
Fitting instruments and keypads.
Making power connections.
Preparation for use.
2
cables.
6-2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents