Siemens SIMATIC CPU 410 System Manual page 238

Process control system, process automation/cpu
Table of Contents

Advertisement

Replacement of failed components during redundant operation
13.3 Replacement of components of the distributed I/O on PROFIBUS DP
Replacement procedure
Proceed as follows to replace PROFIBUS DP cables:
Step
1
2
238
What to do?
Check the cabling and localize the
interrupted PROFIBUS DP cable.
Replace the defective cable.
How does the system react?
The CPUs process the error OBs synchronized
with each other
With one-sided I/O:
Rack failure OB 86 (outgoing event)
The LED BUS1F goes out.
The DP slaves can be addressed via the
DP master system.
With switched I/O:
I/O redundancy error OB 70 (outgoing
event).
The DP slaves can be addressed via both
DP master systems.
The LED BUS1F and the LED REDF go
out.
CPU 410 Process Automation/CPU 410 SMART
System Manual, 05/2017, A5E31622160-AC

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic 410 smartSimatic pcs 7

Table of Contents