1B-22 AIR CONDITIONING (OPTIONAL)
2
A/C Compressor Relay
Inspection
1) Disconnect negative cable at battery.
2) Remove A/C compressor relay (1) from relay box (2).
1
3) Check resistance between each two terminals as in table
below. If check results are as specified, proceed to next
operation check. If not, replace.
Terminals
Between A and B
Between C and D
4) Check that there is continuity between terminals "A" and "B"
when battery is connected to terminals "C" and "D". If found
defective, replace.
Compressor
NOTE:
For G10 engine model, refer to the same section of the
Service Manual mentioned in the "FOREWORD" of this
service manual.
Removal
M13 Engine
1) Run engine at idle speed with air conditioning ON for 10 min-
utes. After that, stop the engine.
2) Disconnect negative (–) cable at battery.
3) Recover refrigerant from refrigeration system by using recov-
ery and recycling equipment.
4) Remove front bumper.
5) Remove engine front cover.
Resistance
∞
(infinity)
Approx. 170
Ω