NOTE: To avoid injury to personnel and damage to equipment or property when
completing the procedures listed in this start---up checklist, use good judgement,
follow safe practices, and adhere to the safety considerations/information as
outlined in the preceding sections of this Installation Instructions document.
MODEL NO.:
DATE:
I. PRE-START-UP:
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j
VERIFY INSTALLATION OF OUTDOOR AIR HOOD
j
VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD (48LC ONLY)
j
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
j
VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE (48LC ONLY)
j
CHECK GAS PIPING FOR LEAKS (48LC ONLY)
j
CHECK THAT INDOOR- -AIR FILTERS ARE CLEAN AND IN PLACE
j
CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE
j
VERIFY THAT UNIT IS LEVEL
j
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY SETSCREW IS TIGHT
j
VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
j
VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION
j
VERIFY INSTALLATION OF THERMOSTAT/SPACE SENSOR
j
VERIFY CONFIGURATION VALUES FOR ELECTRONIC CONTROLS (REFER TO CONTROL SET UP CHECKLIST)
j
VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS (48LC ONLY)
j
II. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
ELECTRIC HEAT AMPS (IF EQUIPPED)
SUPPLY FAN AMPS AT MAX SPEED
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
GAS HEAT SUPPLY AIR (48LC )
ELECTRIC HEAT SUPPLY AIR (50LC)
PRESSURES
GAS INLET PRESSURE
GAS MANIFOLD PRESSURE
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
j
GENERAL
ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
j

UNIT START-UP CHECKLIST

(Remove and Store in Job File)
L1-L2
— UNLOADED
— WITH LOADER
STAGE NO. 1
CIRCUIT A
CIRCUIT A
SERIAL NO:
TECHNICIAN:
L2-L3
L3-L1
L1
L2
L1
L2
L1
L2
L1
L2
F DB (Dry Bulb)
F DB
F DB
F
F
IN. WG
IN. WG
STAGE NO. 2
PSIG
CIRCUIT A Superheat
PSIG
CIRCUIT A Subcooling