Battery System Installation

Internal Battery Installation
Connection of these batteries is to be left to the responsibility of the commissioning personnel in order to
avoid damages to the equipment or personal injuries in case of an incorrect connection. The batteries are
designed to deliver a large amount of energy and an incorrect connection may lead to short circuit and cause
serious injuries to the personnel or damages to the equipment.
Install the internal battery steps as follows:
1. Take out the battery modules from the package, see Fig4-3.
2.Open the battery terminal cover, see Fig4-4.
3.install the battery modules into UPS, see Fig4-5.
Heavy unit. It must be carried by two people at the same time to avoid injury.
battery module handle
Figure 4-3: Take Out the Battery Modules from the Package
ElECTRIC SHOCk!
Only professionals be allowed to remove the battery terminal covers before installation.
Figure 4-4: Open the Battery Terminal Cover
39
NOTE
WARNING
battery terminal cover
25-75 kW
User's and Installation Guide