300
150
65
150
200
200
Top view
Control signal junction
125
Front view
Figure 4-1: 93PR 25-75 kW Gland Plate and Connector Locations (With Internal Battery Version)
37
DC input
UPS output
Power terminal
block
Back view
User's and Installation Guide
BAT +
BAT –
L1
L2
L3
Control signal line entrance
25-75 kW
N
L3
L2
Mains input to Rectifier
L1
L3
L2
Mains input to Bypass
L1
Power line
entrance