Mitel SIP-DECT Site Survey Kit User Manual page 22

Table of Contents

Advertisement

SIP-DECT Site Survey Kit User Guide
–70dBm from the next base station). Ideally, however, at least two base stations within a cluster
should be in sight so that synchronisation is accelerated and fail-safety is increased.
To prevent the measurement from being influenced by other components such as the battery,
the components must be positioned at a distance of at least 30 cm from the base station. Likewise
other metallic objects should be positioned as far away from the base station as possible.
Limit values for field strength measurement provide an indicator of the system's quality; however
they should be verified by an audio connection as the call quality can then be rated directly.
Next walk around the entire radio hop, determine the corresponding locations of the transmitters,
and enter them in your plan.
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents