Site Preparation Checklist - Agilent Technologies 8860 Site Preparation Manual

Gas chromatograph
Hide thumbs Also See for 8860:
Table of Contents

Advertisement

1
Agilent 8860 GC Site Preparation

Site Preparation Checklist

Site Preparation Checklist
For typical system requirements for system installation, see the diagrams on
page
Use the following checklist to ensure that the site is properly prepared for GC system
installation.
6
9.
1 Ensure that the appropriate installation hardware has been acquired.
See
"Installation Kits"
2 Ensure that the location in which the GC system is being installed meets the
requirements for environmental conditions. See
page 24. Also see
"Heat Dissipation"
3 Prepare bench space for the GC system. Ensure that the bench has the size and
weight capacity to accommodate the GC and associated components. See
Preparation"
on page 7. Also see
4 Ensure that system components are oriented so that they can be connected
properly. See
"Maximum Length of Cables and Hoses"
5 If the system being installed includes an MSD, ensure that the bench allows for
proper installation and connection of the foreline pump. See
Requirements for Systems Including an MSD"
6 Ensure that appropriate venting is provided for the GC system. See
Venting"
on page 28.
7 Ensure that a dedicated power circuit is available for each device in the system.
See
"Power Requirements"
8 Ensure that appropriate gas and reagent supplies are provided for the GC system.
See
"Gas and Reagent Selection"
9 Ensure that appropriate gas plumbing is provided for the GC system. See
Plumbing"
on page 49.
10 If the GC system being installed includes a data system, ensure that the PC meets
the requirements necessary to properly support the GC system. For more
information, see the site prep guide for your data system.
11 If the GC being installed is to be connected to a site LAN, ensure that the appropriate
cabling is available. See
on page 14.
on page 25.
"Dimensions and Weight"
on page 32.
on page 40.
"Site LAN Network"
on page 56.
page 8
"Environmental Conditions"
on page 18.
on page 10.
"Foreline Pump
on page 20.
"Exhaust
Site Preparation Guide
through
on
"Bench
"Gas

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents