Site Preparation
Checklist
General
For flame ionization detector
For air-actuated valves
Installation kit
External gas pressure controller accessory
22
Use the checklist below to avoid missing anything. The page
references on many of the items lead you to more detailed
information.
4
Adequate bench space for GC and auxiliary equipment
4
Appropriate operating environment
4
Appropriate tools
4
Appropriate supplies
4
Correct electrical power
4
High-purity carrier gas
4
High-purity hydrogen
4
Dry and clean air
4
House (or better) air
4
An Installation kit, part number 19199M, supplies nuts,
ferrules, tees, caps, and wrenches for Swagelok fittings, plus
copper tubing, a tubing cutter, leak detection fluid, and Torx
drivers.
Accessory G4323A contains two 0.7 MPa (100 psi) regulators
with gauges and shutoff valves.
(page
(page
28)
(page
28)
(page
28)
(page
28)
(page
33)
27)
Getting Started