Dometic 489516P series Installation & Operating Instruction page 10

Durasea roof top air conditioner
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
2. Install two (2) (supplied) sheet metal screws in-
side return air opening to secure ADB to ceiling
template. See (FIG. 17).
3. Install eight (8) (supplied) wood screws inside
the front, rear and side doors to secure ADB to
ceiling. See (FIG. 17).
FIG. 17
2 Sheet
Metal Screws
8 Wood Screws
4. Install front and rear doors.
5. Place filter in return air vent grille. It may already
be installed on some units. See (FIG. 18).
FIG. 18
Return Air
Vent Grille
6. Install return air vent grille into the ADB. Slide re-
turn air vent grille tab into slot in ADB and rotate
up and snap in place. See (FIG. 19).
Filter
10
FIG. 19
Return Air
Vent Grille
7. Install the control knobs into the ADB. See
(FIG. 20).
FIG. 20
8. The unit installation is now complete and is
ready for operation. The power supply to the unit
may now be turned on.
9. Verify that all features of the installed system
work. Please read the following operating in-
structions before attempting to run the unit.
Slot In ADB
Knob

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

489516a series489516p70x489516p71x489516a71x

Table of Contents