NEC Xen Master System Hardware Manual page 131

Hide thumbs Also See for Xen Master:
Table of Contents

Advertisement

System Hardware Manual
Pressing SW2 interrupts all service and causes
!
a second initialization. This switch should not
be used in an operating system unless
absolutely necessary.
System boot by EPROM
On
Off
SW3-2
Off
Not Used
3.3.3
Connectors
Before programming System Data, the battery must be
connected to CN4 to allow memory retention if a power
failure or brownout occurs. If a brownout or power failure
does occur, and the battery backup circuit is not activated,
System Data resets to the default values, all stations in the
system reset to the default values, and any data
programmed on individual stations is cleared.
The following connectors are located on the MBD-
U13 ETU.
MOH IN
PFT
COM1
COM2
CN4
CN5
CN6
AMP1
AMP2
CN403
System boot by Flash ROM
Description
For Music on Hold input
For Power Failure Transfer
For LCR/PC programming
For SMDR
For backup battery
Connects to CN1 of the CLKG-U13
Unit
Connects to CN2 of the CLKG-U13
Unit
MDF cabling connection for slots 1, 3,
4
MDF cabling connection for slots 5, 6,
7
Power Supply connection
May 2001
5 - 113

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xen axis

Table of Contents