Removing the shipping and handling monitors prior to commissioning
NOTICE
Material damage caused by transport indicators remaining in the device during operation
If transport indicators remain in the device during operation, material damage can result
from falling off or through temperature damage.
• Remove the transport indicators before commissioning the inverter.
3.3.2.4
Unpacking
Unpacking
Check the delivery against the delivery note to ensure that all the items have been delivered.
Check that the cabinet is intact and has not been damaged.
The packaging material must be disposed of in accordance with the applicable country-
specific guidelines and rules.
3.3.2.5
Required tools
You require the following tools for installation:
● Spanner or socket spanner (w/f 10)
● Spanner or socket spanner (w/f 13)
● Spanner or socket spanner (w/f 16/17)
● Spanner or socket spanner (w/f 18/19)
● Hexagon-socket spanner (size 8)
● Torque wrench 5 Nm to 50 Nm
● Screwdriver, size 2
● T20 torx screwdriver
● T25 torx screwdriver
● T30 torx screwdriver
A socket wrench kit with two long extensions is recommended.
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A
Mechanical installation
3.3 Assembly
41