Preliminary Checks - Mitsubishi FX2NC DSS Series Hardware Manual

Table of Contents

Advertisement

FX2NC Series Programmable Controllers
7.
Diagnostics
7.1

Preliminary checks

POWER
RUN
Check power supply, ground and I/O cables are wired correctly.
BATT
ERROR
Turn the power supply on. Check the power LED is lit. Down load a small
test program into the PLC using a handheld programmer or MEDOC. Verify
POWER
RUN
the program to ensure it has been written to the PLC correctly. Using the
BATT
programming device force ON/OFF each output. Check the output LEDs for
ERROR
operation.
Put the PLC into RUN. Check the RUN LED is lit. Check the previously down
POWER
RUN
loaded program works correctly. Once all check are complete take the PLC
BATT
out of run and turn OFF the power supply.
ERROR
During this testing stage take extrem care not to touch any live or hazardous
parts.
Diagnostics 7.
7-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fx2nc seriesFx2nc ds series

Table of Contents