Make Electrical Connections - Carrier 19XL series Installation Instructions Manual

50/60 hz hermetic centrifugal liquid chillers with hcfc–22 and hfc–134a
Table of Contents

Advertisement

length of flexible tubing or piping near the device is essential on spring-isolated machines.
4. Cover the outdoor vent with a rain cap and place a condensation drain at the low point in
the vent piping to prevent water build-up on the atmospheric side of the relief device.

Make Electrical Connections

Field wiring must be installed in accordance with job wiring diagrams and all applicable
electrical codes.
CAUTION
Do not run 120-v wiring into the control cabinet. The control cabinet should only
be used for additional extra low-voltage wiring (50 v maximum).
Wiring diagrams in this publication
Figure
27,
Figure
28, and
actual installation; follow job specific wiring diagrams.
!
CAUTION
(Figure
22,
Figure
29) are for reference only and are not intended for use during
Figure
23,
Figure
24,
Figure
25,
Figure
26,

Advertisement

Table of Contents
loading

Table of Contents