To Rig Compressor
Note: The motor end of the 19XL compressor is heavy and will tip backwards unless these
directions are followed:
1. Remove rigging bar
2. Place the rigging bar vertically over the compressor end bell
rigging bar to the compressor end bell using the 2 bolts removed in Step 1.
Additional Notes
1. Use silicon grease on new O-rings when refitting.
2. Use gasket sealant on new gaskets when refitting.
3. Cooler and condenser vessels may be rigged vertically. Rigging should be fixed to all 4
corners of the tube sheet.
(Figure
6, Item 4) and the bolts securing it.
(Figure
6, Item 5). Attach the