Installation; Receiving The Machine; Inspect Shipment - Carrier 19XL series Installation Instructions Manual

50/60 hz hermetic centrifugal liquid chillers with hcfc–22 and hfc–134a
Table of Contents

Advertisement

Receiving the Machine

Inspect Shipment

CAUTION
Do not open any valves or loosen any connections. The standard 19XL machine
is shipped with a full refrigerant charge. Some machines may be shipped with a
nitrogen holding charge as an option.
1. Inspect for shipping damage while machine is still on shipping conveyance. If machine
appears to be damaged or has been torn loose from its anchorage, have it examined by
transportation inspectors before removal. Forward claim papers directly to transportation
company. Manufacturer is not responsible for any damage incurred in transit.
2. Check all items against shipping list. Immediately notify the nearest Carrier representative if
any item is missing.
3. To prevent loss or damage, leave all parts in original packages until beginning installation.
All openings are closed with covers or plugs to prevent dirt and debris from entering
machine components during shipping. A full operating oil charge is placed in the oil sump
before shipment.

Installation

!
CAUTION

Advertisement

Table of Contents
loading

Table of Contents