PVI 23TL, 28TL Installation and Operation Manual (Rev J)
Notice how the cable shield is daisy chained together and not landed inside the inverter. S402 is in the
OFF position, or down towards the Phoenix connector when the inverter is in the middle of the daisy
chain.
Warning: Risk of Electric Shock.
Make sure all shield wires are properly secured and insulated to prevent shorting to any other
components inside the inverter.
6. Close the wiring box.
7. Reconnect AC and DC power and turn the inverter on when it is safe.
8. Configure the Inverter Modbus ID and Baud rate.
DOCR-070365-J
Figure 7.6
Page 38 of 66