Oil Line Connections - Riello F10 Installation Manual

Oil burners
Table of Contents

Advertisement

ELECTRODE
SETTING
IMPORTANT:
THESE DIMENSIONS
MUST BE OBSERVED AND VERIFIED.
D6003
5/32" or 4 mm
5/32"
to 13/64"
or 4 to 5_
....................
-I--
tt_
TURBULATOR
SETTING
A) Loosen
NUT (1), then turn SCREW
(2)
until
the
INDEX
MARKER
(3)
is
aligned
with the correct
index
number
as per
the
Burner
Set-up
chart,
on
page
12.
B) Retighten
the RETAINING
NUT (1).
NOTE:
Zero and five are scale
indica-
tors only. From left to right, the first line
is 5 and the last line 0.
5111111
OIL LINE CONNECTIONS
This burner
is shipped
with the oil pump
set to operate
on a single
line system.
To operate
on a two
line system
the by-pass
plug must
be installed.
Warning:
Do
not
operate
a single
line
system
with
the
by-pass
plug
installed.
Operating
a single
line system
with the by-pass
plug
installed
will result
in damage
to the pump
shaft
seal.
Note:
Pump
pressure
must
be set at time
of burner
start-up.
A pressure
gauge
is
attached
to
the
PRESSURE
PORT
(8)
for
pressure
readings.
Two
PIPE
CONNECTORS
(5) are supplied
with the burner
for connection
to either
a single
or a
two-pipe
system.
Also supplied
are two ADAPTORS
(3), two female
1/4" NPT, to adapt
oil lines to burner
pipe connectors.
All pump
port threads
are British
Parallel
Thread
design.
Direct
connection
of NPT threads
to the pump
will
damage
the pump
body.
F10-
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

40 series

Table of Contents