Riello F10 Installation Manual page 7

Oil burners
Table of Contents

Advertisement

METHOD
2 - SEMI-FLANGE
COLLAR
A)
Follow
item C from
METHOD
1.
B) Align
the air tube
and
attached
adjustable
collar
so air tube
is centered
in the
burner
access
hole of the boiler/furnace
unit. Mark the center
of the two holes
in the
ADJUSTABLE
COLLAR
on to the front
plate
of the heating
unit. Then
drill
1/4 inch
(6.5 mm) holes
through
the front
plate of the unit,
using
marks
as a guide.
C) Install
two short
BOLTS
(1) through
the front
plate
of the heating
unit from
the
inside,
and secure
on the outside
using
the two special
CHROME
NUTS
(2).
D) Follow
item D from
METHOD
1.
METHOD
3 - PEDESTAL
MOUNT
Secure
the
MOUNTING
FLANGE
to
MOUNTING
PEDESTAL
using
the
hardware
provided
with the pedestal.
Secure
burner
to MOUNTING
FLANGE
as in METHOD
1,
items A, C and D.
NOTE:
It is suggested
that
the
pedestal
be anchored
in position
on the
floor
by
installing
brackets
over
the pedestal
tube
and securing
brackets
to the floor.
WARNING:
WHEN THE COMBUSTION
CHAMBER
IS LINED WITH A REFRACTORY
MATERIAL,
IT IS IMPERATIVE
THAT THE
END CONE
NOT PROTRUDE
INTO THE
CHAMBER
AREA,
AS EXCESSIVE
HEAT AT BURNER
SHUT-DOWN
WILL
DAMAGE
THE END CONE.
ELECTRICAL
CONNECTIONS
It is advisable
to leave
the control
box off the sub-base
while
completing
the electrical
connections
to the burner.
1) Wire access hole
(Use BX electrical
connector)
2) Earth ground conductor
terminal
(GREEN WIRE)
3) Hot conductor
terminal
(BLACK WIRE)
4) Neutral conductor
terminal
(WHITE WIRE)
5) Strain relief clamp
WARNING:
The
hot (black)
wire
must be connected
to the L ter-
minal
and
the
neutral
(white)
wire
must be connected
to the N
terminal
or
the
primary
safety
control
will be damaged.
Do not connect
either
wire to the
(_Terminal.
$7454
F10-
5