BKI FKM-TC Series Operation Manual page 56

Extra-large electric pressure fryer series with training central
Table of Contents

Advertisement

Electric Pressure Fryer
Maintenance
3. Fold the open end of the envelope over and install the retaining clip.
4. Place the top screen over the assembly and check that the pickup hole is clear.
5. Install the pickup tube and hand tighten. Make sure the filter envelope is not torn.
54

Advertisement

Table of Contents
loading

Table of Contents