Installation; Unpacking And Handling; Installation Procedure - BKI FKM-TC Series Operation Manual

Extra-large electric pressure fryer series with training central
Table of Contents

Advertisement

Electric Pressure Fryer
Serious injury, equipment damage or death could result if attempting to install
this fryer yourself. Ensure that an authorized BKI service agent installs the fryer.

Unpacking and Handling

It is the owners' responsibility to file all freight claims with the delivering truck line. Inspect all cartons and
crates for damage as soon as they arrive. If damage to cartons or crates is found, or if a shortage is
found, note this on the bill of lading (all copies) prior to signing.
If damage is found when the equipment is opened, immediately call the delivering truck line and follow up
the call with a written report indicating concealed damage to your shipment. Ask for an immediate
inspection of your concealed damage item. Packaging material MUST be retained to show the inspector
from the truck line.

Installation Procedure

Ensure that an authorized BKI service agent installs the fryer. An authorized BKI
service agent should be a qualified gas service technician and a licensed
electrician.
1. Remove the shipping packing materials from the interior and exterior of the fryer.
2. Remove the shipping packing clip from underneath the dead weight cap and discard.
3. Replace the dead weight and cover.
Risk of electric shock – Fryer must be secured to building structure. Follow
restraining device instructions for proper installation.
4. Install an ANSI Z83.11/CGA 1.8 compliant restraining device (such as BKI part number FT0279)
per the instructions below:
Mount the wall attachment according the restraining device manufacturer instructions.
Attach the spring-loaded hook on the restraining device to the eye-bolt mounted to the fryer
then attach the other spring-loaded hook to the wall attachment.

Installation

10
Installation

Advertisement

Table of Contents
loading

Table of Contents