BlackDiamond 10808 Switch Power Supplies and Power Supply Controllers
The front panel of the power supply controllers provide status LEDs. Table 17 describes the LED
behavior on the power supply controllers.
Table 17: Power supply controller LEDs
LED
STATUS
MASTER
PoE PWR CTRL STATUS
PoE PWR CTRL ERROR

Installing the Power Supply Controllers

To install a power supply controller:
1 Attach the ESD strap that is provided to your wrist and connect the metal end to the ground
receptacle that is located on the top-left corner of the BlackDiamond chassis front panel.
2 If a blank faceplate is covering the power supply controller bay, remove it and save it for future use.
3 Ensure that the power supply controller is right side up.
4 Slide the power supply controller into the slot, aligning the notch on the top of the slot with the
power supply controller.
5 Use the thumbscrews and a #2 Phillips screwdriver to secure the power supply controller into the
slot.

Verifying a Successful Installation

After you supply power to the switch, the switch performs a power-on self test (POST).
During the POST:
• All ports are temporarily disabled.
• The packet LED is off.
• The power LED is on.
• The MGMT LED flashes until the switch successfully passes the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (one blink per second). If the switch
fails the POST, the MGMT LED shows a solid yellow light.
86
Color
Indicates
Amber
Diagnostics in progress.
Green
Normal operation.
Blinking Green
Unit is master.
Off
Unit is slave.
Green
Link idle.
Amber
Link busy.
Off
No errors detected.
Amber
Errors detected.