Applicable Industry Standards - Extreme Networks BlackDiamond 10K Series Installation Manual

Table of Contents

Advertisement

Site Preparation
UPS Transition Time
Transition time is the time that is necessary for the UPS to transfer from utility power to full-load
battery power. For Extreme Networks products, a transition time of less than 20 milliseconds is required
for optimum performance.

Applicable Industry Standards

For more information, see the following ANSI/TIA/EIA standards:
• ANSI/TIA/EIA-568-A—discusses the six subsystems of a structured cabling system.
• ANSI/TIA/EIA-569-A—discusses design considerations.
• ANSI/TIA/EIA-606—discusses cabling system administration.
• ANSI/TIA/EIA-607—discusses commercial building grounding and bonding requirements.
You can access these standards at
http://www.ansi.org/
or
http://www.tiaonline.org/.
36
Extreme Networks BlackDiamond 10K-Series Switch Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blackdiamond 10808

Table of Contents