9. Commissioning

Commissioning and maintenance work must only be carried out by trained
personnel.
Only work on the unit when it is at zero volt.
According to EN 50110-1 (VDE 0105-1), only qualified electricians may carry out
the installation and commissioning of the ventilation control unit and connected
accessories.
Observe all regulations stipulated by your local power supply utility and all
VDE regulations.
DIN VDE 0100 regulations regarding the installation of high voltage systems
up to 1000 V
DIN VDE 0105-100 Operation of electrical installations
Only original Wolf accessories may be used (electric coils, servomotors, etc.),
otherwise Wolf cannot accept any liability.
In addition, ÖVE regulations and the local building code apply in Austria.
Before commissioning, check whether the operating data specified on the type
plate is adhered to.
The unit must not be operated before all necessary safety equipment has been
fitted and connected. Intake and discharge apertures must be connected to
ensure contact protection. The CFL-WRG unit must be level and safely secured.
Commissioning must be carried out by authorised personnel (Wolf Customer
Service).
Record the date of commissioning, e.g. in a log book.
According to DIN 1886, tools must be used to open the unit. Wait for the fans
to come to a complete standstill before opening the inspection doors. When
opening the doors, negative pressure may draw in loose objects, which could
damage the fan irreparably or even cause a risk to life if items of clothing are
drawn in. Use tools to tightly seal the doors before commissioning (unit tightness).
17