Trane CVHH CenTraVac Installation, Operation And Maintenance Manual page 15

Water-cooled chillers with tracer adaptiview control
Table of Contents

Advertisement

Less than 1 month
Location requirements:
Solid foundation
Vibration free
Dry
Temperature range -40°F to 158°F
(-40°C to 70°C)
Do not remove any plastic coverings
Do not charge the chiller with refrigerant
If additional refrigerant is on site, follow
manufacturer's storage requirements
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
Notify the local Trane office if charge has
escaped
Do not operate purge unit
(a)
If the chiller will be stored for more than six months after production, contact your local Trane Service Agency for required extended storage actions to
minimize impact to the chiller and preserve the warranty.
CVHH-SVX001G-EN
1–6 months
Location requirements:
Solid foundation
Vibration free
Dry
Temperature range -40°F to 158°F
(-40°C to 70°C)
Do not remove any plastic coverings
Do not charge the chiller with refrigerant
If additional refrigerant is on site, follow
manufacturer's storage requirements
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
Notify the local Trane office if charge has
escaped
Do not operate purge unit
Verify waterbox and tube bundles are
clean and dry
P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Greater than 6 months
Location requirements:
Solid foundation
Vibration free
Dry
Temperature range -40°F to 158°F
(-40°C to 70°C)
Do not remove any plastic coverings
Do not charge the chiller with refrigerant
If additional refrigerant is on site, follow
manufacturer's storage requirements
Verify dry nitrogen pressure using gauge
located on the evaporator shell reads 3 to 5 psig
(20.7 to 34.5 kPaG)
Notify the local Trane office if charge has
escaped
Do not operate purge unit
Verify waterbox and tube bundles are clean and
dry
Conduct an oil analysis and verify no oil
breakdown
(a)
Repeat yearly
Replace oil if breakdown has occurred
If no oil analysis program has been followed,
replace oil prior to start-up
15