Trane CVHH CenTraVac Installation, Operation And Maintenance Manual page 120

Water-cooled chillers with tracer adaptiview control
Table of Contents

Advertisement

A A p p p p e e n n d d i i x x B B : : C C e e n n T T r r a a V V a a c c ™ ™ C C h h i i l l l l e e r r I I n n s s t t a a l l l l a a t t i i o o n n C C o o m m p p l l e e t t i i o o n n a a n n d d R R e e q q u u e e s s t t f f o o r r T T r r a a n n e e S S e e r r v v i i c c e e
Interconnecting wiring, starter to panel (as
required)
External interlocks (flow switch, pumps
auxiliary, etc.)
Chiller motor connection (remote starters)
N N o o t t e e : : Do not make final remote starter-to
compressor motor connections until
requested to do so by the Trane service
representative!
Chilled water pump (connected and tested)
Condenser water pump (connected and tested)
Optional ifm efector® flow detection controller
and sensor cable properly installed and secured
for non-stress at probe connector
Cooling tower fan rotation checked
Heat recovery condenser water pump (as
applicable)
115 Vac power available for service tools
All controls installed and connected
All magnetic starters installed and connected
6. T T e e s s t t i i n n g g
Dry nitrogen available for pressure testing (for
disassembled units)
Material and equipment available for leak
testing, if necessary
7. R R e e f f r r i i g g e e r r a a n n t t
For CDHH and CVHH chillers: Verify supplied
refrigerant is "Solstice ZD" Refrigeration Grade
by checking certificates provided with tanks.
Refrigerant on job site and in close proximity to
chiller.
Total amount in cylinders/drums:
___________ (specify lb or kg) and fill in
specifics below:
Number of cylinders/drums _____ of size
_____ (specify lb or kg)
Number of cylinders/drums _____ of size
_____ (specify lb or kg)
N N o o t t e e : : After commissioning is complete, it is the
installer's responsibility to transport
empty refrigerant containers to an easily
accessible point of loading to facilitate
container return or recycling.
8. S S y y s s t t e e m m
Systems can be operated under load conditions
9. A A v v a a i i l l a a b b i i l l i i t t y y
Electrical, control man, and contractor's
representative are available to evacuate, charge,
120
and test the CenTraVac™ chiller under
serviceman's supervision
10. E E q q u u i i p p m m e e n n t t r r o o o o m m
Does the equipment room have a refrigerant
monitor/sensor capable of monitoring and
alarming within the allowable exposure level of
the refrigerant?
Does the installation have properly placed and
operating audible and visual refrigerant alarms?
Does the equipment room have proper
mechanical ventilation?
If it is required by local code, is a self-contained
breathing apparatus available?
11. O O w w n n e e r r a a w w a a r r e e n n e e s s s s
Has the owner been fully instructed on the
proper use and handling of refrigerant?
Does the owner have a copy of the MSDS for
refrigerant?
N N o o t t e e : : Additional time required to properly complete
the start-up and commissioning, due to any
incompleteness of the installation, will be
invoiced at prevailing rates.
This is to certify that the Trane equipment has been
properly and completely installed, and that the
applicable items listed above have been satisfactorily
completed.
Checklist Completed by
(Print Name):
SIGNATURE:
DATE:
In accordance with your quotation and our purchase
order number ______________, we therefore require the
presence of Trane service on this site, for the purpose
of start-up and commissioning, by ______________
(date).
N N o o t t e e : : Minimum of two week advance notification is
required to allow for scheduling of the chiller
start-up.
ADDITIONAL COMMENTS/INSTRUCTIONS
CVHH-SVX001G-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Centravac cvhh

Table of Contents