4.7 Room to room transfer
1. The two hoists are moved as close to the doorway as possible.
The sling is attached to hoist A.
The lifting straps on hoist A are lowered as far as possible with
concideration to the patient´s comfort.
2. The two lifting straps on hoist B are lowered as much as necessary to
attach them to the sling.
Note! Ensure that the lifting strap hooks are installed correctly.
3. The lifting straps of hoist B are raised while the straps on hoist A are
lowered. Continue until the patient is completely suspended by hoist B.
4. The lifting straps on hoist A is now uncoupled from the sling and rewound.
Note! Beware of dangeling hooks or hand control.
5. The lifting straps on B are rewound to the desired height. The room to
room transfer is now carried out.
22