Furuno CH-300 Installation Manual page 9

Dual frequency searchlight sonar
Hide thumbs Also See for CH-300:
Table of Contents

Advertisement

MOUNTING
1.
Necessary tools and materials
To install the units, prepare the tools and materials shown below.
Name
Wrench
Pipe Wrench
Ball Wrench
Phillips-head
Screwdriver
Socket Driver
Cutter Knife
Nipper
Crimp Tool
Soldering Iron
Liquid Gasket
*: Prepare two pipe wrenches or one pipe wrench and one wrench (M36).
NOTICE
Do not apply paint, anti-corrosive sealant
or contact spray to coating or plastic
parts of the equipment.
Those items contain organic solvents that
can damage coating and plastic parts,
especially plastic connectors.
Necessary Tools
Specification
For M10 (Hex. size 17
mm)
For M20 (Hex. size 30
mm)
For M8 (Hex. size 13 mm)
For M6 (Hex. size 10 mm))
For M36 (Hex. size 55
mm)
55 mm
For M5 (Hex. size 4 mm)
#1
#2
For M4 (Hex. size 7 mm)
-
-
-
-
TB1121 or TB1184
(ThreeBond Holdings Co.,
Ltd.
Qty
Remarks
2
Recommended: double offset
wrench
2
1
1
1*
2*
1
Supplied with the hull unit.
1
1
1
1
1
1
For FV2-4
1
If needed for wiring
1
Liquid gasket may not be supplied
with the product because of
export restrictions in each country.
If not included, prepare specified
liquid gasket locally.
1-1

Advertisement

Table of Contents
loading

Table of Contents