Vacuum Hopper Types, E2K Control Collection Hopper - Matsui JL4-5V-3~6 Operation Manual

Jl4 series u version jet loader
Table of Contents

Advertisement

2.
Suction hopper type E2K control collection hopper
1)
Description of operations
Set the control panel power circuit breaker to ON.
When the equipment starts conveyance by the start of operation, the blower starts rotating in response
to the request signal from the E2K.
Material is conveyed to the collection hopper for the period of time set by the conveyance timer.
When the conveyance timer has run out, the blower stops.
The above operations are repeated.
In a case where respective request signals from multiple conveyance directions are simultaneously
sent, the material is conveyed in the order of No. 1 → No. 2 → No. n → No.2, alternatively.
When the collection hopper has become full, the E2K installed on the collection hopper senses the
conditions to stop conveyance.
When a request signal is sensed again, conveyance is started.
[WO-4841;JL4-V・VC-3~6-27]
Chapter 6 Operational Descriptions and Time Charts
- 27 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jl4-4v-3~6Jl4-6vc-3~6Jl4-6v-3~6Jl4-4vc-3~6Jl4-5vc-3~6

Table of Contents