Step
Operation
Turning on power Turn ON the power breaker in the control panel.
Starting operation Press a desired switch from the No. 1 start/stop
[Adjusting the amount of secondary air suctioned by
the suction nozzle]
Put the suction nozzle into the material and adjust the
secondary air regulator to achieve smooth material
conveyance.
Throttling secondary air flow excessively may cause the hose to be clogged with material.
[WO-4841;JL4-V・VC-3~6-22]
This Chapter describes starting, stopping and cleaning procedures according
to the steps.
1
No.
switch
6
No.
on the operation panel.
The equipment starts conveyance in response to
a request signal.
However, when the collection hopper is full, the
equipment does not start conveyance.
* For details on operation, refer to Chapter 6.
Operational Descriptions and Timing Chart.
NOTE
Description
to the No. 6 start/stop switch
- 22 –
Display
The display
corresponding to
operation of
1
No.
through
6
No.
is turned on during
start.
Conveying set time
(green) and conveying
time (red) appear on the
digital displayer during
conveyance.
Discharge set time
(green) and discharge
time (red) appear on the
digital displayer during
discharge.
Secondary air regulator