Mounting The Collection Hopper - Matsui JL4-5V-3~6 Operation Manual

Jl4 series u version jet loader
Table of Contents

Advertisement

Chapter 3 Installation
1.
Mounting collection hopper
1) Jet Clone type limit, level, cylinder control
Vacuum port hose
Material port
hose
Jet Clone
Jet Clone- limit switch control
Step
Drilling mounting holes
1
Mounting Jet Clone
2
Mounting level switch
3
* Only when the
collection hopper is
controlled by the
level switch
(not common)
[WO-4841;JL4-V・VC-3~6-10]
This Chapter describes installation work of the product for each piece of
equipment according to the procedure.
Hopper
Task
Drill holes in the hopper to be mounted so that they match the
mounting holes in the Jet Clone.
* It is recommended to tap the hopper holes so that the collection
hopper can be secured with bolts alone. When the holes are not
tapped, the collection hopper should be secured with bolts and
nuts. In this case, an adequate measure should be taken to
prevent the bolts and nuts from falling into the hopper if they
loosen and fall off.
Mount the Jet Clone on the hopper on which mounting holes are
drilled.
Drill holes at the specified positions in the hopper on which the
suction hopper is mounted, and install the level switch.
Blade
- 10 -
Pneumatic
Jet Clone
Jet Clone- pneumatic cylinder control (not common)
Description
Split pin
Flat washer
Packing
Nut
Material port hose
Vacuum port hose
Hopper
Level switch main body
Connector

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jl4-4v-3~6Jl4-6vc-3~6Jl4-6v-3~6Jl4-4vc-3~6Jl4-5vc-3~6

Table of Contents