3.2. Assembly steps

The assembly of the DRYPOINT
compressed air. The purge air outlet (2) points from left → right to the front for orienting.
It is recommended that a bypass pipe (1) is installed for maintenance and service works. Take into account hereby that
30 cm space is required for the operation of the control unit.
Assemble the supplied long nipples and non-return valve in the outlet of the membrane dryer in the through flow 
direction
(refer to the arrow on the non-return valve).
The purge air must be able to flow unimpaired from the area covered by the screen (2).
The installation room and/or the contained units, plants, systems and equipment must not release chemical substances.
The installation location must be frost free, the temperature at the installation location, as well as the compressed air
temperature, must be between +2 and +50 °C.
Thoroughly clean the pipework network before the installation (e.g. through blowing out).
Seal all threads with Teflon tape → do not use liquid sealants.
Install the unit so that no damage to the drying system can occur when exchanging the filter.
22
 M eco control drying systems must be executed depending on the flow direction of the 
®
1
30 cm / 12"