3.2. Assembly steps
The assembly of the DRYPOINT
compressed air. The purge air outlet (2) points from left → right to the front for orienting.
•
It is recommended that a bypass pipe (1) is installed for maintenance and service works. Take into account hereby that
30 cm space is required for the operation of the control unit.
•
Assemble the supplied long nipples and non-return valve in the outlet of the membrane dryer in the through flow
direction
(refer to the arrow on the non-return valve).
•
The purge air must be able to flow unimpaired from the area covered by the screen (2).
•
The installation room and/or the contained units, plants, systems and equipment must not release chemical substances.
•
The installation location must be frost free, the temperature at the installation location, as well as the compressed air
temperature, must be between +2 and +50 °C.
•
Thoroughly clean the pipework network before the installation (e.g. through blowing out).
•
Seal all threads with Teflon tape → do not use liquid sealants.
•
Install the unit so that no damage to the drying system can occur when exchanging the filter.