Carrier R080-528 Installation Instructions Manual page 37

Air-cooled chillers, 60 hz
Table of Contents

Advertisement

MAXIMUM SHIPPING
WEIGHT WITHOUT
UNIT
PACKAGING
30GXN,R
lb
153, 283A,
328B, 393B,
9,446
418B
153, 283A,
328B, 393B,
10,846
418B
163, 303A
10,041
163, 303A
11,709
174
9,476
174
10,876
178,
10,122
328A, 353A/B
178,
11,790
328A, 353A/B
LEGEND
— Unit with Optional Copper-Fin Coils
NOTES:
1. 2.62 in. (67 mm) diameter holes provided for lifting unit with Schedule 40 pipe.
2. Rigging option 1:
Rig with a minimum of 25 ft (7620 mm) chains or cables.
If a central lifting point is used, it must be a minimum of 13 ft (3962 mm) above
the top of the unit.
Spreader bars made from steel or double-nailed and notched 2 x 6's approxi-
mately 8 ft (2438 mm) long must be placed just above the top of the unit and
stacks to reduce the risk of damage to the top of the unit and coil.
Chains on the cooler/compressor side must be shortened by 20 in. (508 mm),
by the use of grab hooks for a more level lift.
Two-in. diameter, schedule 40 pipes should be used in the unit rigging holes.
3. Rigging option 2:
Rig with a minimum of 12 ft (3658 mm) chains or cables.
If a central lifting point along the bar is used, the lift point must be over the
center of gravity.
30GXN,R153, 163, 174, 178 AND ASSOCIATED MODULAR UNITS
MAXIMUM SHIPPING
WEIGHT WITH
PACKAGING
kg
lb
kg
4285
10,446
4738
4920
11,846
5373
4555
11,041
5008
5311
12,709
5765
4298
10,476
4752
4933
11,876
5387
4591
11,122
5045
5348
12,790
5801
Fig. 28 — Rigging Information (cont)
LIFTING HOLES
A
B
in.
mm
in.
mm
82.0
2083
99.0
2515
82.0
2083
99.0
2515
60.0
1521
103.0
2616
60.0
1521
103.0
2616
82.0
2083
99.0
2515
82.0
2083
99.0
2515
60.0
1521
103.0
2616
60.0
1521
103.0
2616
Lifting bars must be a minimum of 8 ft (2438 mm) long, and must be placed
just above the top of the unit and stacks to reduce the risk of damage to the
top of the unit and coil.
Two-in. diameter, schedule 40 pipes should be used in the unit rigging
holes.
4. If overhead rigging is not available, the unit can be moved on rollers or
dragged. When unit is moved on rollers, the unit skid, if equipped, must be
removed. To lift the unit, use jacks at the rigging points. Use a minimum of
one roller every 3 ft [915 mm] to distribute the load. If the unit is to be
dragged, lift the unit as described above, and place unit on a pad. Apply
moving force to the pad, not the unit. When in its final location, raise the
unit and remove the pad.
5. Check bill of lading for shipping weight of unit.
6. Center of gravity for lifting purposes only.
All panels must be in place when rigging unit. Do not attempt to forklift
unit if no skid is supplied.
37
CENTER OF GRAVITY
C
D
in.
mm
in.
mm
35.0
889
106.0
2692
35.0
889
106.0
2692
37.0
940
133.0
3378
37.0
940
133.0
3378
35.0
889
106.0
2692
35.0
889
106.0
2692
37.0
940
133.0
3378
37.0
940
133.0
3378

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecologic 30gxn

Table of Contents