Trane Sintesis RTAF Installation, Operation And Maintenance Manual page 88

Air-cooled chillers
Table of Contents

Advertisement

8. Owner awareness
 If it is required by local code, is a self-contained breathing apparatus available?
 Has the owner been fully instructed on the proper use of refrigerant?
 Does the owner have a copy of the MSDS for refrigerant?
 Was the owner given a copy of the Refrigerant Handling Guidelines?
Note: Additional time required to properly complete the start-up and commissioning, due to any incompleteness of the
installation, will be invoiced at prevailing rates.
This is to certify that theTrane
have been satisfactorily completed.
Checklist completed by: ______________________________________________________________________________________________
Signed: _____________________________________________________________________
In accordance with your quotation and our purchase order number __________________, we will therefore require the presence
ofTrane service on this site, for the purpose of start-up and commissioning, by __________________ (date).
Note: Minimum two-week advance notification is required to allow scheduling of the chiller start-up.
Additional comments/instructions: ____________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
Note: A copy of this completed from must be submitted to theTrane Service Office that will be responsible for start-up of chiller.
All trademarks referenced in this document are the trademarks of their respective owners.
Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the
leader in creating and sustaining safe, comfortable and energy efficient environments, Trane offers a broad
portfolio of advanced controls and HVAC systems, comprehensive building services, and parts. For more
information, visit www.Trane.com.
Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice.
© 2015Trane All rights reserved
RTAF-ADF001A-EN 05 Jun 2015
(New)
®
equipment has been properly and completely installed, and that the applicable items listed above
We are committed to using environmentally
conscious print practices that reduce waste.
Date: _______________________________

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents