Trane Sintesis RTAF Installation, Operation And Maintenance Manual page 87

Air-cooled chillers
Table of Contents

Advertisement

Sintesis™ RTAF
Installation Completion Check Sheet and Request for Trane Service
Important:
A copy of this completed form must be submitted to theTrane service agency that will be responsible for the start-
up of the chiller. Start-up will NOT proceed unless applicable items listed in this form have been satisfactorily
completed. See unit IOM RTAF-SVX001*-EN for detailed installation instructions.
To:
S.O. Number:
Job/Project Name:
Address:
The following items are being installed and will be completed by:
Important:
Start-up must be performed byTrane or an agent ofTrane specifically authorized to perform start-up ofTrane
products. Contractor shall provideTrane (or an agent ofTrane specifically authorized to perform start-up) with
notice of the scheduled start-up at least two weeks prior to the scheduled start-up.
Check boxes if the task is complete or if the answer is "yes. "
1. Chiller
 Installation meets foundation requirements.
 In place and piped.
 Isolation pads or elastomeric pads installed (optional).
2. Piping
 Water piping flushed before making final connections to the system
Chilled water piping connected to:
 Evaporator
 Air handling units
 Pumps
 Flow switch or flow proving device installed
 Strainer installed in entering evaporator water piping and cleaned
 Water supply connected to filling system
 Systems filled
 Pumps run, air bled from system
 Relief valve ventilation piping installed (if applicable)
 Flow balancing valves installed in leaving chilled water
 Gauges, thermometers and air vents installed on both sides of evaporator
3. Wiring
 Wire size per submittal and NEC
 Full power available, and within utilization range
 External interlocks (flow switch, pumps auxiliary, etc.)
 Chilled water pump (connected and tested)
 115 Vac power available for service tools (recommended)
 All controls installed and connected
4. Testing
 Dry nitrogen available for pressure testing
 Trace gas amounts of R-134a or R-513A available for leak testing (if required)
5.  Refrigerant on job site (if nitrogen charge option, model number digit 16 = 3 or 4, is chosen)
6.  Systems can be operated under load conditions
7. Heaters
 If unit was factory charged (model number digit 16 = 1 or 2), energize heaters for 24 hours prior to start up.
Important:
It is required that chiller heaters are energized for a minimum of 24 hours prior to start up.
Therefore, chiller should have power for this amount of time beforeTrane Service arrives to do start-up.
 If unit has nitrogen charge (model number digit 16 = 3 or 4), contactTrane Service for unit charging prior to start-up.
RTAF-ADF001A-EN
Trane Service Office:
Serial Numbers:
®
1