Water Pipe Work - Samsung AE090MNYDEH Installation Manual

Air to water heat pump -tdm plus hydro unit
Hide thumbs Also See for AE090MNYDEH:
Table of Contents

Advertisement

Water pipe work

The hydro unit is equipped with components listed on the table below.
The hot and cold water supply connections are clearly marked on the unit with labels. And service valves are provided.
Whole water plumbing system including Hydro unit shall be installed by a qualified technician and must comply with all relevant
European and national regulations.
• Allowable water pressure of hydro unit is maximum 3.0 bar.
• 2 service valves are provided with the Hydro unit. To facilitate service and maintenance work, install R-Type service valve at the
water inlet of the hydro unit and L-Type service valve at the water outlet of the hydro unit.
• An air-vent valve is integrated on the hydro unit. Please check that air-vent valve is not overtightened so the air-vent valve can
release any air out of the system during system operation.
No.
01
02
03
Hydro unit
04
05
06
07
Name
1.25" BSPP
3/8" BSPP
Pressure relief valve
Air-vent valve
Manometer
Flow switch
Strainer
03
04
02
06
07
05
01
Tightening Torque
350 ~ 380 kgf•cm
120 ~ 150 kgf•cm
120 ~ 150 kgf•cm
120 ~ 150 kgf•cm
92~ 102 kgf•cm
72 ~ 82 kgf•cm
350 ~ 380 kgf•cm
34 ~ 37 N•m
12 ~ 15 N•m
12 ~ 15 N•m
12 ~ 15 N•m
9 ~ 10 N•m
7 ~ 8 N•m
34 ~ 37 N•m
17
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae090mnydghAe160mnydehAe160mnydgh

Table of Contents