General Venting Requirements Model Ep-100, Ep-200 And Ep-300 Series Pumps - Roberts Gorden CoRayVac CRV-B-12 Installation & Operation Manual

Custom-engineered, low-intensity infrared heating systems installation, operation & service manual
Hide thumbs Also See for CoRayVac CRV-B-12:
Table of Contents

Advertisement

CRV-S
I
, O
ERIES
NSTALLATION
PERATION AND

9.2 General Venting Requirements Model EP-100, EP-200 and EP-300 Series Pumps

This heater must be vented in accordance with the
rules contained in this manual and with the following
national codes and any state, provincial or local
codes which may apply: United States: Refer to
ANSI Z223.1 (NFPA 54) - latest revision; Canada:
Refer to CAN/CGA-B149.1 and B149.2 - latest
revision.
Any portion of vent pipe passing through a
combustible wall must have an approved thimble
to conform with the above listed codes.
Vent pipe must be sloped downward away from the
pump ¼'' every 10' (3 m).
The bottom of the vent or air intake terminal shall not
be located less than 1
'
The vent shall not terminate less than 7
above grade where located adjacent to public
walkways.
Vent terminal must be installed at a height sufficient
to prevent blockage by snow, and building materials
protected from degradation by flue gases.
Secure all joints with #8 x 3/8 sheet metal screws.
Seal all joints with high temperature silicone sealant.
Vent terminal must be beyond any combustible
overhang.
9.2.1 Vertical Venting
See Page 33, Figure 15 for recommended vertical
venting options.
32
S
M
ERVICE
ANUAL
(.3 m) above grade level.
(2.1 m)
'
9.2.2 Horizontal Venting
See Page 34, Figure 16 through Page 36, Figure 18
for recommended horizontal venting options.
9.2.3 United States Requirements
Vent must terminate at least 3
forced air inlet located within 10
Vent must terminate at least 4
4
(1.2 m) horizontally from, or 1
'
door, operable window, or gravity air inlet into any
building.
9.2.4 Canadian Requirements
The vent shall not terminate within 6
mechanical air supply inlet to any building.
The vent shall not terminate within 3
window or door that can be opened in any building,
any non-mechanical air supply inlet to any building,
or of the combustion air inlet of any other appliance.
Length Requirements
See Page 33, Figure 15 through Page 36, Figure 18
for recommended vent lengths and sizes.
Seal all pipe joints with high temperature silicone
sealant in the vent pipe. Insulation and additional
sealing measures will be required.
Optional heat exchanger lengths are considered as
vent length for length determination.
Subtract 15' (4 m) of maximum allowed vent or
outside air duct length per vent elbow if more than
three are used.
(.9 m) above any
'
(3.1 m).
'
(1.2 m) below,
'
(.3 m) above any
'
(1.8 m) of a
'
(.9 m) of a
'

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents