Roberts Gorden CoRayVac CRV-B-12 Installation & Operation Manual page 5

Custom-engineered, low-intensity infrared heating systems installation, operation & service manual
Hide thumbs Also See for CoRayVac CRV-B-12:
Table of Contents

Advertisement

TABLE OF FIGURES
Figure 1: Standard Reflector ..................................................... 4
Figure 2: One Side Reflector..................................................... 4
Figure 3: Two Side Reflectors ................................................... 4
Figure 4: Universal Shield, Position 1 ....................................... 5
Figure 5: Universal Shield, Position 2 ....................................... 5
Figure 6: Universal Shield, Position 3 ....................................... 5
Figure 7: 2-Foot Deco Grille...................................................... 6
Figure 8: Barrier Shield ............................................................. 6
Figure 9: 1-Foot Deco Grille ...................................................... 6
Figure 10: Major Component Descriptions................................ 8
Figure 11: Heater Assembly Overview ................................... 14
Figure 12: Critical Hanger Placement ..................................... 15
Figure 13: Reflector Joint Detail .............................................. 22
Figure 15: Vertical Venting Configuration ................................ 33
Venting Configurations........................................... 35
Venting Configurations........................................... 36
Figure 19: Duct Sizing ............................................................ 37
Figure 21: Filter Housing Assembly ........................................ 38
Figure 22: Air Supply Blower Support ..................................... 39
Figure 23: Pressurized Outside Air Supply.............................. 39
without Control Panel ............................................. 44
Figure 29: General System Wiring .......................................... 46
120 V 1 Ø Pump .................................................... 46
120 V 1 Ø Pump .................................................... 47
Figure 33: Burner Internal Wiring ............................................ 48
Figure 34: Burner Internal Ladder Diagram ............................ 48
Figure 35: Vacuum Reading.................................................... 50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents