Figure 4: Universal Shield, Position 1; Figure 5: Universal Shield, Position 2; Figure 6: Universal Shield, Position 3 - Roberts Gorden CoRayVac CRV-B-12 Installation & Operation Manual

Custom-engineered, low-intensity infrared heating systems installation, operation & service manual
Hide thumbs Also See for CoRayVac CRV-B-12:
Table of Contents

Advertisement

NOTE:
1. All dimensions are from the surfaces of all tubes, couplings, elbows, tees and crosses.
2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from
where the combustion chamber and the tube connect.

FIGURE 4: UNIVERSAL SHIELD, POSITION 1

FIGURE 5: UNIVERSAL SHIELD, POSITION 2

FIGURE 6: UNIVERSAL SHIELD, POSITION 3

Model
A
CRV-B-2
4
12
CRV-B-4
4
12
CRV-B-6
4
12
CRV-B-8
4
12
CRV-B-9
8
18
CRV-B-10
8
18
CRV-B-12
8
18
CRV-B-12A
8
18
Model
A
CRV-B-2
4
24
CRV-B-4
4
24
CRV-B-6
4
24
CRV-B-8
4
24
CRV-B-9
4
36
CRV-B-10
4
36
CRV-B-12
4
36
CRV-B-12A
4
36
Model
A
CRV-B-2
4
12
CRV-B-4
4
12
CRV-B-6
4
12
CRV-B-8
4
12
CRV-B-9
8
12
CRV-B-10
8
12
CRV-B-12
8
12
CRV-B-12A
8
12
(inches)
B
C
D
12
12
11
12
12
11
12
12
11
12
12
11
24
18
21
24
18
21
24
18
21
24
18
21
(inches)
B
C
D
48
24
11
48
24
11
48
24
11
48
24
11
48
36
11
48
36
11
48
36
11
48
36
11
(inches)
B
C
D
56
30
11
56
30
11
56
30
11
56
30
11
60
42
21
60
42
21
60
42
21
60
42
21
SECTION 3: C
C
RITICAL
ONSIDERATIONS
(centimeters)
A
B
C
31
31
31
31
31
31
31
31
31
31
31
31
46
61
46
46
61
46
46
61
46
46
61
46
(centimeters)
A
B
C
61
122
61
61
122
61
61
122
61
61
122
61
92
122
92
92
122
92
92
122
92
92
122
92
(centimeters)
A
B
C
31
143
77
31
143
77
31
143
77
31
143
77
31
153
107
31
153
107
31
153
107
31
153
107
D
D
D
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents